
01 · Complete bathroom installation
Complete bathroom installation
Strip-out to handover on a single programme. Wet trades coordinated so the tiler is not waiting on a missing trap.
03 · Bath
A bathroom is a plumbing drawing you can stand in. KERN takes first-fix, sanitaryware, showers and the last seal as one sequence — then hands over a room, not a collection of fittings.


01 · Complete bathroom installation
Strip-out to handover on a single programme. Wet trades coordinated so the tiler is not waiting on a missing trap.

02 · Plumbing preparation
First-fix heights set to the sanitaryware that was actually ordered. Waste, supplies and the valve you can still reach after the wall is closed.

03 · Fixtures and sanitary installations
Basins, WCs, concealed frames, baths. We install the specified set — and we say so when a fitting will not survive Dutch water.

04 · Walk-in showers
Linear drains, correct falls, waterproofing that is a system rather than a paint. Step-free where the structure allows it.

05 · Renovations
1930s stacks, 1970s soil pipes, apartments with one shared riser. The existing building is the brief. The new room has to live with it.

06 · Finishing and handover
Silicon lines, access panels, a one-page spec and the date the first flexible hose should be replaced. The job ends when the occupant can explain the room.
Start a job
The form never leaves this browser. The telephone link is a placeholder tel: number.