
Plumbing · Oudwijk, Utrecht
Riser replacement in a 1930s townhouse
Copper and PE-Xc through occupied floors, without emptying the house.
Full riser replacement · 11 working days
Open case04 · Work
Every case below is demonstration content: real photography, invented jobs. Replace with your own sites before a client launch.

Plumbing · Oudwijk, Utrecht
Copper and PE-Xc through occupied floors, without emptying the house.
Full riser replacement · 11 working days
Open case
Heating · Leidsche Rijn, Utrecht
Low flow temperatures, a quiet outdoor unit, loops that match the rooms.
Air-to-water heat pump · 3 weeks
Open case
Bathrooms · Wittevrouwen, Utrecht
Concealed frame, rain shower, a room that still services from the front.
Concealed frame + rain shower · 16 working days
Open case
Plumbing · Nieuwegein
Stainless waste, copper feed, open again before the first bake.
Commercial kitchen first-fix · 9 nights
Open case
Heating · Zeist
Ground floor loops without raising the finished level past the doors.
Underfloor, ground floor · 12 working days
Open case
Bathrooms · Amersfoort
Linear drain, large-format tile, a fall you cannot see and can still feel.
Walk-in, step-free · 14 working days
Open case