Riser replacement in a 1930s townhouse

Copper and PE-Xc through occupied floors, without emptying the house.

Riser replacement in a 1930s townhouse
Category
Plumbing
Location
Oudwijk, Utrecht
Materials / system
Copper + PE-Xc · Full riser replacement
Completion time
11 working days

Scope

Full stack, laterals and two bathrooms on a live supply.

Challenge

Galvanised risers had pinholed on the second floor. The family stayed in the house. Tile in the main bathroom had to survive.

Solution

Isolated floor by floor. New copper riser in the existing chase, PE-Xc laterals, and a temporary kitchen feed so cooking never stopped. Bathrooms second-fixed after pressure test.

Result

Static pressure restored. No finish replaced except the access panels we designed to be opened again.

Riser replacement in a 1930s townhouse — before, demonstration pair
Before · demonstration
Riser replacement in a 1930s townhouse — detail
After / detail

Start a job

Send a work order. Or call if water is already on the floor.

The form never leaves this browser. The telephone link is a placeholder tel: number.