Bathrooms · 2024
Apartment bathroom, rebuilt in sixteen days
Concealed frame, rain shower, a room that still services from the front.

- Category
- Bathrooms
- Location
- Wittevrouwen, Utrecht
- Materials / system
- Stoneware + chrome · Concealed frame + rain shower
- Completion time
- 16 working days
Scope
Full strip-out, waterproofing, sanitaryware, heated towel rail.
Challenge
A shared soil stack and a landlord who needed the apartment let the following month.
Solution
Prefabricated the frame off-site. Waterproofing as a documented system. Sanitaryware limited to fittings with replaceable cartridges.
Result
Handover with a one-page spec and a photographed access panel. Demonstration story.

Start a job
Send a work order. Or call if water is already on the floor.
The form never leaves this browser. The telephone link is a placeholder tel: number.