Heating · 2024
Radiators out, underfloor in a 1970s bungalow
Ground floor loops without raising the finished level past the doors.

- Category
- Heating
- Location
- Zeist
- Materials / system
- PE-Xc on insulation board · Underfloor, ground floor
- Completion time
- 12 working days
Scope
Strip radiators, insulate, PE-Xc on board, new manifold, boiler retained.
Challenge
Door thresholds and a boiler that still had years left. The brief was comfort, not a plant swap.
Solution
Low-profile board system, door undercuts where agreed, weather compensation retuned for floor emitters.
Result
Even heat, boiler still in service. Demonstration retrofit.

Start a job
Send a work order. Or call if water is already on the floor.
The form never leaves this browser. The telephone link is a placeholder tel: number.